WORD
|
Definition
|
Acceptance Criteria
|
A set of conditions that is required to be met before
deliverables are accepted.
|
Accepted
|
Products, results or capabilities produced by a project and
validated by the project customer or sponsors as meeting their specified
acceptance criteria.
|
Accuracy
|
Within the quality management system, accuracy is an
assessment of correctness.
|
Acquire Project Team
|
The process of confirming human resource availability and
obtaining the team necessary to complete project activities.
|
Acquisition
|
Obtaining human and material resources necessary to perform
project activities. Acquisition implies a cost of resources, and is not
necessarily financial.
|
Activity
|
A distinct, scheduled portion of work performed during the
course of a project.
|
Activity Attributes
|
Multiple attributes associated with each schedule activity
that can be included within the activity list. Activity attributes include
activity codes, predecessor activities, successor activities, logical
relationships, leads and lags, resource requirements, imposed dates,
constraints, and assumptions.
|
Activity Code
|
One or more numerical or text values that identify
characteristics of the work or in some way categorize the schedule activity
that allows filtering and ordering of activities within reports.
|
Activity Cost Estimates
|
The projected cost of the schedule activity that includes the
cost for all resources required to perform and complete the activity,
including all cost types and cost components.
|
Activity Duration
|
The time in calendar units between the start and finish of a
schedule activity. See also duration.
|
Activity Duration Estimate
|
A quantitative assessment of the likely amount or outcome for
the duration of an activity.
|
Activity Identifier
|
A short, unique numeric or text identification assigned to
each schedule activity to differentiate that project activity from other
activities. Typically unique within any one project schedule network diagram.
|
Activity List
|
A documented tabulation of schedule activities that shows the
activity description, activity identifier, and a sufficiently detailed scope
of work description so project team members understand what work is to be
performed.
|
Activity Network Diagrams
|
A graphical representation of the logical relationships among
the project schedule activities.
|
Activity-on-Node (AON)
|
A technique used for constructing a schedule model in which
activities are represented by nodes and are graphically linked by one or more
logical relationships to show the sequence in which the activities are to be
performed.
|
Activity Resource Requirements
|
The types and quantities of resources required for each
activity in a work package.
|
Actual Cost (AC)
|
The realized cost incurred for the work performed on an
activity during a specific time period.
|
Actual Duration
|
The time in calendar units between the actual start date of
the schedule activity and either the data date of the project schedule if the
schedule activity is in progress or the actual finish date if the schedule
activity is complete.
|
Adaptive Life Cycle
|
A project life cycle, also known as change-driven or agile
methods, that is intended to facilitate change and require a high degree of
ongoing stakeholder involvement. Adaptive life cycles are also iterative and
incremental, but differ in that iterations are very rapid (usually 2-4 weeks
in length) and are fixed in time and resources.
|
Additional Quality Planning Tools
|
A set of tools used to define the quality requirements and to
plan effective quality management activities. They include, but are not
limited to: brainstorming, force field analysis, nominal group techniques and
quality management and control tools.
|
Adjusting Leads and Lags
|
A technique used to find ways to bring project activities that
are behind into alignment with plan during project execution.
|
Advertising
|
The process of calling public attention to a project or
effort.
|
Affinity Diagram
|
A group creativity technique that allows large numbers or
ideas to be classified into groups for review and analysis.
|
Agreements
|
Any document or communication that defines the initial
intentions of a project. This can take the form of a contract, memorandum of
understanding (MOU), letters of agreement, verbal agreements, email, etc.
|
Alternative Analysis
|
A technique used to evaluate identified options in order to
select which options or approaches to use to execute and perform the work of
the project.
|
Alternatives Generation
|
A technique used to develop as many potential options as
possible in order to identify different approaches to execute and perform the
work of the project.
|
Analogous Estimating
|
A technique for estimating the duration or cost of an activity
or a project using historical data from a similar activity or project.
|
Analytical Techniques
|
Various techniques used to evaluate, analyze, or forecast
potential outcomes based on possible variations of project or environmental
variables and their relationships with other variables.
|
Application Area
|
A category of projects that have common components significant
in such projects, but are not needed or present in all projects. Application
areas are usually defined in terms of either the product (i.e., by similar
technologies or production methods) or the type of customer (i.e., internal
versus external, government versus commercial) or industry sector (i.e.,
utilities, automotive, aerospace, information technologies, etc.).
Application areas can overlap.
|
Applying Leads and Lags
|
A technique that is used to adjust the amount of time between
the predecessor and successor activities.
|
Apportioned Effort
|
An activity where effort is allotted proportionally across
certain discrete efforts and not divisible into discrete efforts. [Note:
Apportioned effort is one of three earned value management (EVM) types of
activities used to measure work performance.]
|
Approved Change Request
|
A change request that has been processed through the
integrated change control process and approved.
|
Approved Change Requests Review
|
A review of the change request to verify that these were
implemented as approved.
|
Assumption
|
A factor in the planning process that is considered to be
true, real, or certain, without proof or demonstration.
|
Assumptions Analysis
|
A technique that explores the accuracy of assumptions and
identifies risks to the project from inaccuracy, inconsistency, or
incompleteness of assumptions.
|
Attribute Sampling
|
Method of measuring quality that consists of noting the
presence (or absence) of some characteristic (attribute) in each of the units
under consideration. After each unit is inspected, the decision is made to
accept a lot, reject it, or inspect another unit.
|
Authority
|
The right to apply project resources, expend funds, make
decisions, or give approvals.
|
Backlog
|
A listing of product requirements and deliverable to be
completed, written as stories, and prioritized by the business to manage and
organize the project's work.
|
Backward Pass
|
A critical path method technique for calculating the late
start and late finish dates by working backward through the schedule model
from the project end date.
|
Bar Chart
|
A graphic display of schedule-related information. In the
typical bar chart, schedule activities or work breakdown structure components
are listed down the left side of the chart, dates are shown across the top,
and activity durations are shown as date-placed horizontal bars. See also
Gantt chart.
|
Baseline
|
The approved version of a work product that can be changed
only through formal change control procedures and is used as a basis for
comparison.
|
Basis of Estimates
|
Supporting documentation outlining the details used in
establishing project estimates such as assumptions, constraints, level of
detail, ranges, and confidence levels.
|
Benchmarking
|
Benchmarking is the comparison of actual or planned practices,
such as processes and operations, to those of comparable organizations to
identify best practices, generate ideas for improvement, and provide a basis
for measuring performance.
|
Bidder Conference
|
The meeting with prospective sellers prior to the preparation
of a bid or proposal to ensure all prospective vendors have a clear and
common understanding of the procurement. Also known as contractor
conferences, vendor conferences, or pre-bid conferences.
|
Bottom-Up Estimating
|
A method of estimating project duration or cost by aggregating
the estimates of the lower-level components of the work breakdown structure
(WBS).
|
Brainstorming
|
A general data gathering and creativity technique that can be
used to identify risks, ideas, or solutions to issues by using a group of
team members or subject matter experts.
|
Budget
|
The approved estimate for the project or any work breakdown
structure component or any schedule activity.
|
Budget at Completion (BAC)
|
The sum of all budgets established for the work to be
performed.
|
Buffer
|
A provision in the project management plan to mitigate cost
and/or schedule risk. Often used with a modifier (e.g., management reserve,
contingency reserve) to provide further detail on what types of risk are
meant to be mitigated.
|
Business Case
|
A documented economic feasibility study used to establish
validity of the benefits of a selected component lacking sufficient
definition and that is used as a basis for the authorization of further
project management activities.
|
Business Value
|
A concept that is unique to each organization and includes
tangible and intangible elements. Through the effective use of project,
program, and portfolio management disciplines, organizations will possess the
ability to employ reliable, established processes to meet enterprise
objectives and obtain greater business value for their investments.
|
Buyer
|
The acquirer of products, services, or results for an
organization.
|
Cause and Effect Diagram
|
A decomposition technique that helps trace an undesirable
effect back to its root cause.
|
Central Tendency
|
A property of the central limit theorem predicting that the
data observations in a distribution will tend to group around a central
location. The three typical measures of central tendency are the mean,
median, and mode.
|
Change Control
|
A process whereby modifications to documents, deliverables, or
baselines associated with the project are identified, documented, approved,
or rejected.
|
Change Control Board (CCB)
|
A formally chartered group responsible for reviewing,
evaluating, approving, delaying, or rejecting changes to the project, and for
recording and communicating such decisions.
|
Change Control System
|
A set of procedures that describes how modifications to the
project deliverables and documentation are managed and controlled.
|
Change Control Tools
|
Manual or automated tools to assist with change and/or
configuration management. At a minimum, the tools should support the
activities of the CCB.
|
Change Log
|
A comprehensive list of changes made during the project. This
typically indicates dates of the change and impacts in terms of time, cost,
and risk.
|
Change Request
|
A formal proposal to modify any document, deliverable, or
baseline.
|
Charter
|
A document issued by the project initiator or sponsor that
formally authorizes the existence of a project and provides the project
manager with the authority to apply organizational resources to project
activities.
|
Checklist Analysis
|
A technique for systematically reviewing materials using a
list for accuracy and completeness.
|
Checksheets
|
A tally sheet that can be used as a checklist when gathering
data.
|
Claim
|
A request, demand, or assertion of rights by a seller against
a buyer, or vice-verca, for consideration, compensation, or payment under the
terms of a legally binding contract, such as for a disputed change.
|
Claims Administration
|
The process of processing, adjudicating, and communicating
contract claims.
|
Close Procurements
|
The process of completing each project procurement.
|
Close Project or Phase
|
The process of finalizing all activities across all of the
Project Management Process Groups to formally complete a project or phase.
|
Closed Procurements
|
Project contracts or other procurement agreements that have
been formally acknowledged by the proper authorizing agent as being finalized
and signed off.
|
Closing Process Group
|
The process performed to finalize all activities across all
Process Groups to formally close a project or phase.
|
Code of Accounts
|
A numbering system used to uniquely identify each component of
the work breakdown structure (WBS).
|
Collect Requirements
|
The process of determining, documenting, and managing
stakeholder needs and requirements to meet project objectives.
|
Collocation
|
An organizational placement strategy where the project team
members are physically located close to one another in order to improve
communication, working relationships, and productivity.
|
Communication Constraints
|
Restrictions on the content, timing, audience, or individual
who will deliver a communication usually stemming from specific legislation
or regulation, technology, or organizational policies.
|
Communication Methods
|
A systematic procedure, technique, or process used to transfer
information among project stakeholders.
|
Communication Models
|
A description, analogy or schematic used to represent how the
communication process will be performed for the project.
|
Communication Requirements Analysis
|
An analytical technique to determine the information needs of
the project stakeholders through interviews, workshops, study of lessons
learned from previous projects, etc.
|
Communication Technology
|
Specific tools, systems, computer programs, etc., used to
transfer information among project stakeholders.
|
Communications Management Plan
|
A component of the project, program, or portfolio management
plan that describes how, when and by whom information about the project will
be administered and disseminated.
|
Compliance
|
A general concept of conforming to a rule, standard, law, or
requirement such that the assessment of compliance results in a binomial
result stated as "compliant" or "noncompliant."
|
Conduct Procurements
|
The process of obtaining seller responses, selecting a seller,
and awarding a contract.
|
Configuration Management System
|
A subsystem of the overall project management system. It is a
collection of formal documented procedures used to apply technical and
administrative direction and surveillance to: identify and document the
functional and physical characteristics of a product, result, service, or
component; control any changes to such characteristics; record or report each
change and its implementation status; and support the audit of the products,
results, or components to verify conformance to requirements. It includes the
documentation, tracking systems, and defined approval levels necessary for authorizing
and controlling changes.
|
Conflict Management
|
Handling, controlling, and guiding a conflictual situation to
achieve a resolution.
|
Conformance
|
Within the quality management system, conformance is a general
concept of delivering results that fall within the limits that define
acceptable variation for a quality requirement.
|
Conformance Work
|
In the cost of quality framework, conformance work is done to
compensate for imperfections that prevent organizations from completing
planned activities correctly as essential first-time work. Conformance work
consists of actions that are related to prevention and inspection.
|
Constraint
|
A limiting factor that affects the execution of a project,
program, portfolio, or process.
|
Context Diagrams
|
A visual depiction of the product scope showing a business
system (process, equipment, computer system, etc.), and how people and other
systems (actors) interact with it.
|
Contingency
|
An event or occurrence that could affect the execution of the
project that may be accounted for with a reserve.
|
Contingency Allowance
|
A provision in the project management plan to mitigate cost
and/or schedule risk. Often used with a modifier (e.g., management reserve,
contingency reserve) to provide further detail on what types of risk are
meant to be mitigated.
|
Contingency Reserve
|
Budget within the cost baseline or performance measurement
baseline that is allocated for identified risks that are accepted and for
which contingent or mitigating responses are developed.
|
Contingent Response Strategies
|
Responses provided which may be used in the event that a
specific trigger occurs.
|
Contract
|
A contract is a mutually binding agreement that obligates the
seller to provide the specified product or service or result and obligates
the buyer to pay for it.
|
Contract Change Control System
|
The system used to collect, track, adjudicate, and communicate
changes to a contract.
|
Control
|
Comparing actual performance with planned performance,
analyzing variances, assessing trends to effect process improvements,
evaluating possible alternatives, and recommending appropriate corrective
action as needed.
|
Control Account
|
A management control point where scope, budget, actual cost,
and schedule are integrated and compared to earned value for performance
measurement.
|
Control Chart
|
A graphic display of process data over time and against
established control limits, which has a centerline that assists in detecting
a trend of plotted values toward either control limit.
|
Control Communications
|
The process of monitoring and controlling communications
throughout the entire project life cycle to ensure the information needs of
the project stakeholders are met.
|
Control Costs
|
The process of monitoring the status of the project to update
the project costs and managing changes to the cost baseline.
|
Control Limits
|
The area composed of three standard deviations on either side
of the centerline or mean of a normal distribution of data plotted on a
control chart, which reflects the expected variation in the data. See also
specification limits.
|
Control Procurements
|
The process of managing procurement relationships, monitoring
contract performance, and making changes and corrections as appropriate.
|
Control Quality
|
The process of monitoring and recording results of executing
the quality activities to assess performance and recommend necessary changes.
|
Control Risks
|
The process of implementing risk response plans, tracking
identified risks, monitoring residual risks, identifying new risks, and
evaluating risk process effectiveness throughout the project.
|
Control Schedule
|
The process of monitoring the status of project activities to
update project progress and manage changes to the schedule baseline to
achieve the plan.
|
Control Scope
|
The process of monitoring the status of the project and
product scope and managing changes to the scope baseline.
|
Control Stakeholder Engagement
|
The process of monitoring overall project stakeholder
relationships and adjusting strategies and plans for engaging stakeholders.
|
Corrective Action
|
An intentional activity that realigns the performance of the
project work with the project management plan.
|
Cost Aggregation
|
Summing the lower-level cost estimates associated with the
various work packages for a given level within the project's WBS or for a
given cost control account.
|
Cost Baseline
|
The approved version of the time-phased project budget,
excluding any management reserves, which can be changed only through formal
change control procedures and is used as a basis for comparison to actual
results.
|
Cost Management Plan
|
A component of a project or program management plan that
describes how costs will be planned, structured, and controlled.
|
Cost of Quality
|
A method of determining the costs incurred to ensure quality.
Prevention and appraisal costs (cost of conformance) include costs for
quality planning, quality control (QC), and quality assurance to ensure
compliance to requirements (i.e., training, QC systems, etc.). Failure costs
(cost of nonconformance) include costs to rework products, components, or
processes that are non-compliant, costs of warranty work and waste, and loss
of reputation.
|
Cost Performance Index (CPI)
|
A measure of the cost efficiency of budgeted resources
expressed as the ratio of earned value to actual cost.
|
Cost Plus Award Fee Contracts (CPAF)
|
A category of contract that involves payments to the seller
for all legitimate actual costs incurred for completed work, plus an award
fee representing seller profit.
|
Cost Plus Fixed Fee Contract (CPFF)
|
A type of cost-reimbursable contract where the buyer
reimburses the seller for the seller's allowable costs (allowable costs are
defined by the contract) plus a fixed amount of profit (fee).
|
Cost Plus Incentive Fee Contract (CPIF)
|
A type of cost-reimbursable contract where the buyer
reimburses the seller for the seller's allowable costs (allowable costs are
defined by the contract), and the seller earns its profit if it meets defined
performance criteria.
|
Cost Variance (CV)
|
The amount of budget deficit or surplus at a given point in
time, expressed as the difference between the earned value and the actual
cost.
|
Cost-Benefit Analysis
|
A financial analysis tool used to determine the benefits
provided by a project against its costs.
|
Cost-Reimbursable Contract
|
A type of contract involving payment to the seller for the
seller's actual costs, plus a fee typically representing seller's profit.
Cost-reimbursable contracts often include incentive clauses where, if the
seller meets or exceeds selected project objectives, such as schedule targets
or total cost, then the seller receives from the buyer an incentive or bonus
payment.
|
Crashing
|
A technique used to shorten the schedule duration for the
least incremental cost by adding resources.
|
Create WBS
|
The process of subdividing project deliverables and project
work into smaller, more manageable components.
|
Criteria
|
Standards, rules, or tests on which a judgment or decision can
be based or by which a product, service, result, or process can be evaluated.
|
Critical Chain Method
|
A schedule method that allows the project team to place
buffers on any project schedule path to account for limited resources and
project uncertainties.
|
Critical Path
|
The sequence of activities that represents the longest path
through a project, which determines the shortest possible duration.
|
Critical Path Activity
|
Any activity on the critical path in a project schedule.
|
Critical Path Method
|
A method used to estimate the minimum project duration and
determine the amount of scheduling flexibility on the logical network paths
within the schedule model.
|
Customer
|
Customer is the person(s) or organization(s) that will pay for
the project's product, service, or result. Customers can be internal or
external to the performing organization.
|
Customer Satisfaction
|
Within the quality management system, a state of fulfillment
in which the needs of a customer are met or exceeded for the customer's
expected experiences as assessed by the customer at the moment of evaluation.
|
Data Date
|
A point in time when the status of the project is recorded.
|
Data Gathering and Representation Techniques
|
Techniques used to collect, organize, and present data and
information.
|
Decision Tree Analysis
|
A diagramming and calculation technique for evaluating the
implications of a chain of multiple options in the presence of uncertainty.
|
Decomposition
|
A technique used for dividing and subdividing the project
scope and project deliverables into smaller, more manageable parts.
|
Defect
|
An imperfection or deficiency in a project component where
that component does not meet its requirements or specifications and needs to
be either repaired or replaced.
|
Defect Repair
|
An intentional activity to modify a nonconforming product or
product component.
|
Define Activities
|
The process of identifying and documenting the specific
actions to be performed to produce the project deliverables.
|
Define Scope
|
The process of developing a detailed description of the
project and product.
|
Deliverable
|
Any unique and verifiable product, result, or capability to
perform a service that is required to be produced to complete a process,
phase, or project.
|
Delphi Technique
|
An information gathering technique used as a way to reach a
consensus of experts on a subject. Experts on the subject participate in this
technique anonymously. A facilitator uses a questionnaire to solicit ideas
about the important project points related to the subject. The responses are
summarized and are then recirculated to the experts for further comment.
Consensus may be reached in a few rounds of this process. The Delphi
technique helps reduce bias in the data and keeps any one person from having
undue influence on the outcome.
|
Dependency
|
A dependency between two activities, or between an activity
and a milestone.
|
Dependency Determination
|
A technique used to identify the type of dependency that is
used to create the logical relationships between predecessor and successor
activities.
|
Design of Experiments
|
A statistical method for identifying which factors may
influence specific variables of a product or process under development or in
production.
|
Determine Budget
|
The process of aggregating the estimated costs of individual
activities or work packages to establish an authorized cost baseline.
|
Develop Project Charter
|
The process of developing a document that formally authorizes
the existence of a project and provides the project manager with the
authority to apply organizational resources to project activities.
|
Develop Project Management Plan
|
The process of defining, preparing, and coordinating all
subsidiary plans and integrating them into a comprehensive project management
plan.
|
Develop Project Team
|
The process of improving competencies, team member
interaction, and overall team environment to enhance project performance.
|
Develop Schedule
|
The process of analyzing activity sequences, durations,
resource requirements, and schedule constraints to create the project
schedule model.
|
Diagramming Techniques
|
Approaches to presenting information with logical linkages
that aid in understanding.
|
Dictatorship
|
A group decision-making technique in which one individual
makes the decision for the group.
|
Direct and Manage Project Work
|
The process of leading and performing the work defined in the
project management plan and implementing approved changes to achieve the
project's objectives.
|
Discrete Effort
|
An activity that can be planned and measured and that yields a
specific output. Note: Discrete effort is one of three earned value
management (EVM) types of activities used to measure work performance.
|
Discretionary Dependency
|
A relationship that is established based on knowledge of best
practices within a particular application area or an aspect of the project
where a specific sequence is desired.
|
Document Analysis
|
An elicitation technique that analyzes existing documentation
and identifies information relevant to the requirements.
|
Documentation Reviews
|
The process of gathering a corpus of information and reviewing
it to determine accuracy and completeness.
|
Duration (DU or DUR)
|
The total number of work periods (not including holidays or
other nonworking periods)required to complete a schedule activity or work
breakdown structure component. Usually expressed as work days or work weeks.
Sometimes incorrectly equated with elapsed time. Contrast with effort.
|
Early Finish Date (EF)
|
In the critical path method, the earliest possible point in
time when the uncompleted portions of a schedule activity can finish based on
the schedule network logic, the data date, and any schedule constraints.
|
Early Start Date (ES)
|
In the critical path method, the earliest possible point in
time when the uncompleted portions of a schedule activity can start based on
the schedule network logic, the data date, and any schedule constraints.
|
Earned Value (EV)
|
The measure of work performed expressed in terms of the budget
authorized for that work.
|
Earned Value Management
|
A methodology that combines scope, schedule, and resource
measurements to assess project performance and progress.
|
Effort
|
The number of labor units required to complete a schedule
activity or work breakdown structure component,often expressed in hours,
days, or weeks.
|
Emotional Intelligence
|
The capability to identify, assess, and manage the personal
emotions of oneself and other people, as well as the collective emotions of
groups of people.
|
Enterprise Environmental Factors
|
Conditions, not under the immediate control of the team, that
influence,constrain, or direct the project, program, or portfolio.
|
Estimate
|
A quantitative assessment of the likely amount or outcome.
Usually applied to project costs, resources,effort, and durations and is
usually preceded by a modifier (i.e. preliminary, conceptual, feasibility,
order-of magnitude,definitive). It should always include some indication of
accuracy (e.g. x percent). See also budget and cost.
|
Estimate Activity Durations
|
The process of estimating the number of work periods needed to
complete individual activities with estimated resources.
|
Estimate Activity Resources
|
The process of estimating the type and quantities of material,
human resources,equipment, or supplies required to perform each activity.
|
Estimate at Completion (EAC)
|
The expected total cost of completing all work expressed as
the sum of the actual cost to date and the estimate to complete.
|
Estimate Costs
|
The process of developing an approximation of the monetary
resources needed to complete project activities.
|
Estimate to Complete (ETC)
|
The expected cost to finish all the remaining project work.
|
Execute
|
Directing, managing, performing, and accomplishing the project
work; providing the deliverables; and providing work performance information.
|
Executing Process Group
|
Those processes performed to complete the work defined in the
project management plan to satisfy the project specifications.
|
Expected Monetary Value (EMV) Analysis
|
A statistical technique that calculates the average outcome
when the future includes scenarios that may or may not happen. A common use
of this technique is within decision tree analysis.
|
Expert Judgment
|
Judgment provided based upon expertise in an application area,
knowledge area, discipline,industry, etc., as appropriate for the activity
being performed. Such expertise may be provided by any group or person with
specialized education, knowledge, skill, experience, or training.
|
External Dependency
|
A relationship between project activities and non-project
activities.
|
Facilitated Workshops
|
An elicitation technique using focused sessions that bring key
cross-functional stakeholders together to define product requirements.
|
Failure Mode and Effect Analysis (FMEA)
|
An analytical procedure in which each potential failure mode
in every component of a product is analyzed to determine its effect on the
reliability of that component and, by itself or in combination with other
possible failure modes, on the reliability of the product or system and on
the required function of the component; or the examination of a product (at
the system and/or lower levels) for all ways that a failure may occur. For
each potential failure, an estimate is made of its effect on the total system
and of its impact. In addition, a review is undertaken of the action planned
to minimize the probability of failure and to minimize its effects.
|
Fallback Plan
|
Fallback plans include an alternative set of actions and tasks
available in the event that the primary plan needs to be abandoned because of
issues, risks, or other causes.
|
Fast Tracking
|
A schedule compression technique in which activities or phases
normally done in sequence are performed in parallel for at least a portion of
their duration.
|
Fee
|
Represents profit as a component of compensation to a seller.
|
Finish Date
|
A point in time associated with a schedule activity's
completion. Usually qualified by one of the following: actual, planned,
estimated, scheduled, early, late, baseline, target, or current.
|
Finish-to-Finish (FF)
|
A logical relationship in which a successor activity cannot
finish until a predecessor activity has finished.
|
Finish-to-Start (FS)
|
A logical relationship in which a successor activity cannot
start until a predecessor activity has finished.
|
Firm-Fixed-Price Contract (FFP)
|
A type of fixed price contract where the buyer pays the seller
a set amount(as defined by the contract), regardless of the seller's costs.
|
Fishbone diagram
|
See Cause and Effect Diagram.
|
Fixed Formula Method
|
An earned value method for assigning a specified percentage of
budget value for a work package to the start milestone of the work package
with the remaining budget value percentage assigned when the work package is
complete.
|
Fixed Price Incentive Fee Contract (FPIF)
|
A type of contract where the buyer pays the seller a set
amount (as defined by the contract), and the seller can earn an additional
amount if the seller meets defined performance criteria.
|
Fixed Price with Economic Price Adjustment Contracts (FP-EPA)
|
A fixed-price contract, but with a special provision allowing
for predefined final adjustments to the contract price due to changed
conditions, such as inflation changes, or cost increases (or decreases) for
specific commodities.
|
Fixed-Price Contracts
|
An agreement that sets the fee that will be paid for a defined
scope of work regardless of the cost or effort to deliver it.
|
Float
|
The amount of time that a schedule activity can be delayed
without delaying the early start date of any successor or violating a
schedule constraint.
|
Flowchart
|
The depiction in a diagram format of the inputs, process
actions, and outputs of one or more processes within a system.
|
Focus Groups
|
An elicitation technique that brings together prequalified
stakeholders and subject matter experts to learn about their expectations and
attitudes about a proposed product, service, or result.
|
Forecast
|
An estimate or prediction of conditions and events in the
project's future based on information and knowledge available at the time of
the forecast. The information is based on the project's past performance and
expected future performance, and includes information that could impact the
project in the future, such as estimate at completion and estimate to
complete.
|
Forward Pass
|
A critical path method technique for calculating the early
start and early finish dates by working forward through the schedule model
from the project start date or a given point in time.
|
Free Float
|
The amount of time that a schedule activity can be delayed
without delaying the early start date of any successor or violating a
schedule constraint.
|
Functional Manager
|
Someone with management authority over an organizational unit
within a functional organization. The manager of any group that actually
makes a product or performs a service. Sometimes called a line manager.
|
Functional Organization
|
A hierarchical organization where each employee has one clear
superior, and staff are grouped by areas of specialization and managed by a
person with expertise in that area.
|
Funding Limit Reconciliation
|
The process of comparing the planned expenditure of project
funds against any limits on the commitment of funds for the project to
identify any variances between the funding limits and the planned
expenditures.
|
Gantt Chart
|
A bar chart of schedule information where activities are
listed on the vertical axis, dates are shown on the horizontal axis, and
activity durations are shown as horizontal bars placed according to start and
finish dates.
|
Grade
|
A category or rank used to distinguish items that have the
same functional use (e.g., "hammer") but do not share the same
requirements for quality (e.g., different hammers may need to withstand
different amounts of force).
|
Ground Rules
|
Expectations regarding acceptable behavior by project team
members.
|
Group Creativity Techniques
|
Techniques that are used to generate ideas within a group of
stakeholders.
|
Group Decision-Making Techniques
|
Techniques to assess multiple alternatives that will be used
to generate,classify, and prioritize product requirements.
|
Guideline
|
An official recommendation or advice that indicates policies,
standards, or procedures for how something should be accomplished.
|
Hammock Activity
|
A group of related schedule activities aggregated and
displayed as a single activity.
|
Hard Logic
|
A relationship that is contractually required or inherent in
the nature of the work.
|
Histogram
|
A special form of bar chart used to describe the central
tendency, dispersion, and shape of a statistical distribution.
|
Historical Information
|
Documents and data on prior projects including project files,
records, correspondence,closed contracts, and closed projects.
|
Human Resource Management Plan
|
A component of the project management plan that describes how
the roles and responsibilities, reporting relationships, and staff management
will be addressed and structured.
|
Idea/Mind Mapping
|
Technique used to consolidate ideas created through individual
brainstorming sessions into a single map to reflect commonality and
differences in understanding and to generate new ideas.
|
Identify Risks
|
The process of determining which risks may affect the project
and documenting their characteristics.
|
Identify Stakeholders
|
The process of identifying the people, groups, or
organizations that could impact or be impacted by a decision, activity, or
outcome of the project; and analyzing and documenting relevant information
regarding their interests, involvement, interdependencies, influence, and
potential impact on project success.
|
Imposed Date
|
A fixed date imposed on a schedule activity or schedule
milestone, usually in the form of a"start no earlier than" and
"finish no later than" date.
|
Incentive Fee
|
A set of financial incentives related to cost, schedule, or
technical performance of the seller.
|
Incremental Life Cycle
|
A project life cycle where the project scope is generally
determined early in the project life cycle, but time and cost estimates are
routinely modified as the project team's understanding of the product
increases. Iterations develop the product through a series of repeated
cycles, while increments successively add to the functionality of the
product.
|
Independent Estimates
|
A process of using a third party to obtain and analyze
information to support prediction of cost, schedule, or other items.
|
Influence Diagram
|
A graphical representation of situations showing causal
influences, time ordering of events,and other relationships among variables
and outcomes.
|
Information Gathering Techniques
|
Repeatable processes used to assemble and organize data across
a spectrum of sources.
|
Information Management Systems
|
Facilities, processes, and procedures used to collect, store,
and distribute information between producers and consumers of information in
physical or electronic format.
|
Initiating Process Group
|
Those processes performed to define a new project or a new
phase of an existing project by obtaining authorization to start the project
or phase.
|
Input
|
Any item, whether internal or external to the project that is
required by a process before that process proceeds. May be an output from a
predecessor process.
|
Inspection
|
Examining or measuring to verify whether an activity,
component, product, result, or service conforms to specified requirements.
|
Inspections and Audits
|
A process to observe performance of contracted work or a
promised product against agreed-upon requirements.
|
Interpersonal Skills
|
Ability to establish and maintain relationships with other
people.
|
Interrelationship Digraphs
|
A quality management planning tool, the interrelationship
digraphs provide a process for creative problem-solving in moderately complex
scenarios that possess intertwined logical relationships.
|
Interviews
|
A formal or informal approach to elicit information from
stakeholders by talking to them directly.
|
Invitation for Bid (IFB)
|
Generally, this term is equivalent to request for proposal.
However, in some application areas, it may have a narrower or more specific
meaning.
|
Issue
|
A point or matter in question or in dispute, or a point or
matter that is not settled and is under discussion or over which there are
opposing views or disagreements.
|
Issue Log
|
A project document used to document and monitor elements under
discussion or in dispute between project stakeholders.
|
Iterative Life Cycle
|
A project life cycle where the project scope is generally
determined early in the project life cycle, but time and cost estimates are
routinely modified as the project team's understanding of the product
increases. Iterations develop the product through a series of repeated
cycles, while increments successively add to the functionality of the
product.
|
Lag
|
The amount of time whereby a successor activity is required to
be delayed with respect to a predecessor activity.
|
Late Finish Date (LF)
|
In the critical path method, the latest possible point in time
when the uncompleted portions of a schedule activity can finish based on the
schedule network logic, the project completion date, and any schedule
constraints.
|
Late Start Date (LS)
|
In the critical path method, the latest possible point in time
when the uncompleted portions of a schedule activity can start based on the
schedule network logic, the project completion date, and any schedule
constraints.
|
Lead
|
The amount of time whereby a successor activity can be
advanced with respect to a predecessor activity.
|
Lessons Learned
|
The knowledge gained during a project which shows how project
events were addressed or should be addressed in the future with the purpose
of improving future performance.
|
Lessons Learned Knowledge Base
|
A store of historical information and lessons learned about
both the outcomes of previous project selection decisions and previous
project performance.
|
Level of Effort (LOE)
|
An activity that does not produce definitive end products and
is measured by the passage of time. [Note: Level of effort is one of three
earned valued management (EVM) types of activities used to measure work
performance.
|
Leveling
|
A technique in which start and finish dates are adjusted based
on resource constraints with the goal of balancing demand for resources with
the available supply.
|
Life Cycle
|
The series of phases that a project passes through from its
initiation to its closure.
|
Log
|
A document used to record and describe or denote selected
items identified during execution of a process or activity. Usually used with
a modifier, such as issue, quality control, action, or defect.
|
Logical Relationship
|
A dependency between two activities, or between an activity
and a milestone.
|
Majority
|
Support from more than 50 percent of the members of the group.
|
Make-or-Buy Analysis
|
The process of gathering and organizing data about product
requirements and analyzing them against available alternatives including the
purchase or internal manufacture of the product.
|
Make-or-Buy Decisions
|
Decisions made regarding the external purchase or internal
manufacture of a product.
|
Manage Communications
|
The process of creating, collecting, distributing, storing,
retrieving, and the ultimate disposition of project information in accordance
with the communications management plan.
|
Manage Project Team
|
The process of tracking team member performance, providing
feedback, resolving issues,and managing team changes to optimize project
performance.
|
Manage Stakeholder Engagement
|
The process of communicating and working with stakeholders to
meet their needs/expectations, address issues as they occur, and foster
appropriate stakeholder engagement in project activities throughout the
project life cycle.
|
Management Reserve
|
An amount of the project budget withheld for management
control purposes. These are budgets reserved for unforeseen work that is
within scope of the project. The management reserve is not included in the
performance measurement baseline (PMB).
|
Management Skills
|
The ability to plan, organize, direct, and control individuals
or groups of people to achieve specific goals.
|
Mandatory Dependency
|
A relationship that is contractually required or inherent in
the nature of the work.
|
Market Research
|
The process of gathering information at conferences, online
reviews, and a variety of sources to identify market capabilities.
|
Master Schedule
|
A summary-level project schedule that identifies the major
deliverables and work breakdown structure components and key schedule
milestones. See also milestone schedule.
|
Material
|
The aggregate of things used by an organization in any
undertaking, such as equipment, apparatus, tools,machinery, gear, material,
and supplies.
|
Matrix Diagrams
|
A quality management and control tool used to perform data
analysis within the organizational structure created in the matrix. The
matrix diagram seeks to show the strength of relationships between
factors,causes, and objectives that exist between the rows and columns that
form the matrix.
|
Matrix Organization
|
Any organizational structure in which the project manager
shares responsibility with the functional managers for assigning priorities
and for directing the work of persons assigned to the project.
|
Methodology
|
A system of practices, techniques, procedures, and rules used
by those who work in a discipline.
|
Milestone
|
A significant point or event in a project, program, or
portfolio.
|
Milestone List
|
A list identifying all project milestones and normally
indicates whether the milestone is mandatory or optional.
|
Milestone Schedule
|
A summary-level schedule that identifies the major schedule
milestones. See also master schedule.
|
Monitor
|
Collect project performance data with respect to a plan,
produce performance measures, and report and disseminate performance
information.
|
Monitor and Control Project Work
|
The process of tracking, reviewing, and reporting the progress
to meet the performance objectives defined in the project management plan.
|
Monitoring and Controlling Process Group
|
Those processes required to track, review, and regulate the
progress and performance of the project; identify any areas in which changes
to the plan are required; and initiate the corresponding changes.
|
Monte Carlo Simulation
|
A process which generates hundreds or thousands of probable
performance outcomes based on probability distributions for cost and schedule
on individual tasks. The outcomes are then used to generate a probability
distribution for the project as a whole.
|
Most Likely Duration
|
An estimate of the most probable activity duration that takes
into account all of the known variables that could affect performance.
|
Multi-Criteria Decision Analysis
|
This technique utilizes a decision matrix to provide a
systematic analytical approach for establishing criteria, such as risk
levels, uncertainty, and valuation, to evaluate and rank many ideas.
|
Near-Critical Activity
|
A schedule activity that has low total float. The concept of
near-critical is equally applicable to a schedule activity or schedule
network path. The limit below which total float is considered near critical
is subject to expert judgment and varies from project to project.
|
Negotiated Settlements
|
The process of reaching final equitable settlement of all
outstanding issues, claims, and disputes through negotiation.
|
Negotiation
|
The process and activities to resolving disputes through
consultations between involved parties.
|
Network
|
A graphical representation of the logical relationships among
the project schedule activities.
|
Network Analysis
|
The technique of identifying early and late start dates, as
well as early and late finish dates, for the uncompleted portions of project
schedule activities. See also backward pass, critical path method,critical
chain method, and resource leveling.
|
Network Logic
|
The collection of schedule activity dependencies that makes up
a project schedule network diagram.
|
Network Path
|
Any continuous series of schedule activities connected with
logical relationships in a project schedule network diagram.
|
Networking
|
Establishing connections and relationships with other people
from the same or other organizations.
|